Projects
Route 2 from Woodstock to Grand Falls:
Welch Surveys Ltd. was involved with the Four lane Highway from Woodstock to Grand Falls in the following capacities:
1) Layout of Right of Way clearing limits
2) Verification of Sub-grade elevations
3) Subdivision of Additional Right of Way requirements
4) Layout of Signage and Lighting